F
Frederic
Hello,
I am having problems leveling enterprise resources. I created a very simple
project to try to understand what is going wrong with 4 identical tasks (same
duration, work, etc..). I assigned an "entreprise resource" to the first 2
and a "local" (i.e. non-entreprise) resource to the last 2.
I then hit "level now" and the last 2 tasks are properly levelled whereas
the first two stay unchanged.
I really need to do optimisation at a project level (basically, i do not
care about overallocation at an entreprise level for now).
Anybody can help ?
Fred
PS: i looked at the thread " Resource Leveling Problems" with no luck.
I am having problems leveling enterprise resources. I created a very simple
project to try to understand what is going wrong with 4 identical tasks (same
duration, work, etc..). I assigned an "entreprise resource" to the first 2
and a "local" (i.e. non-entreprise) resource to the last 2.
I then hit "level now" and the last 2 tasks are properly levelled whereas
the first two stay unchanged.
I really need to do optimisation at a project level (basically, i do not
care about overallocation at an entreprise level for now).
Anybody can help ?
Fred
PS: i looked at the thread " Resource Leveling Problems" with no luck.