I can show the "status indicator" column which will show me whether a task is
on or behind schedule based on my inputs.
I'd like to have a column that tells me what percentage each task SHOULD be
at at that particular point in time.
This will help me to gauge whether the project as a whole is still ahead
percentagely, even if some of the tasks are being shown as not started.
Thanks,
-Kevin.