When I export the project schedule to a spreadsheet with fields like
work (in days), e.g., "4d", is there a way I can export the field in
numeric format so that I can do some computation in the spreadsheet?
Thanks.
Frank
work (in days), e.g., "4d", is there a way I can export the field in
numeric format so that I can do some computation in the spreadsheet?
Thanks.
Frank