i have a task that occurs at irregular intervals. so i entered the task as i
normally would and just extended the bar and split it as many times as the
task occurs so that the same task is on the same line just at different times
of the year. i need to be able to label each bar. the whole line will be the
same label. but it wont show up on any of the bars that occur after the first
bar. is there a way that i can do this?