When you create your resources you include the materials you need to track
in the list on the resource sheet along with the work resources and mark
them as material under the type column. The unit you use to measure
consumption is entered in the material label column. If it was movie film
the label might be "feet", for example, or if it was coal, perhaps "tons"
etc. The cost per unit is entered in the same standard rate column that you
use for the labour cost of your work resources. Then when you assign
resources to tasks, you entered the number of units of materials you
estimate that task will require in the resource assignment dialog, just like
you enter the effort percentage of the work resources you're assigning. You
can enter it as either the absolute amount, ie, 5000 feet of film which will
remain constant regardless of the task duration, or you can enter it as a
consumption rate, 500/hour, and it will calculate the total amount based on
the task duration. So if you were making a movie, a certain task might look
like this:
Task:
Film Car Crash, Duration 3 hours
Resource Assignments:
Director 100%
Camera Operator 100%
Stunt Driver 100%
Panavision Camera 300% (meaning we have 3 cameras set up)
70mm Film 3000/hour (meaning we'll expect to expose about 3000 feet of
film for each hour of the shoot, 1000 feet per camera, a total of 9000
unless the duration changes)
Any of the reports or views that show individual resource costs will show
the breakdown. Hope this helps