J
JNorris
I haven't been able to find this problem posted. I have a spreadsheet
with dates in the long format (Wednesday, June 9, 2004). Some dates
are entered directly and some are calculated by the WORKDAY function.
When I merge these fields into a word document, sometimes the merged
data changes the day of the week - not the date itself (e.g. Tuesday,
June 9, 2004). It's always off by one day. The data is correct in the
spreadsheet.
I haven't been able to determine a source for this problem and it
doesn't happen for every field.
Any ideas would be greatly appreciated!
with dates in the long format (Wednesday, June 9, 2004). Some dates
are entered directly and some are calculated by the WORKDAY function.
When I merge these fields into a word document, sometimes the merged
data changes the day of the week - not the date itself (e.g. Tuesday,
June 9, 2004). It's always off by one day. The data is correct in the
spreadsheet.
I haven't been able to determine a source for this problem and it
doesn't happen for every field.
Any ideas would be greatly appreciated!