You may add additional baseline bars to the view with the Format>Bar Styles
command. Use the existing bar style definitions as a guide to add the bars
for Baseline5, Baseline6 etc.
You are right you are limited to four rows but the Multiple Baseline Gantt
shows Baseline, Baseline1, and Baseline2 all at row 1. So with some
manipulation of the bar styles in rows two through 4 I was quickly able to
show Baseline through Baseline7 without trouble. Granted, it wasn't
pretty - but it was possible. ;-)
Thanks for the tip though, that may also help phxcm.
You are right you are limited to four rows but the Multiple Baseline
Gantt shows Baseline, Baseline1, and Baseline2 all at row 1. So with
some manipulation of the bar styles in rows two through 4 I was
quickly able to show Baseline through Baseline7 without trouble. Granted,
it wasn't pretty - but it was possible. ;-)
Thanks for the tip though, that may also help phxcm.