V
Vikas Mehra
I'm not sure if there is a connection to our other issue we're having -- the
other issue refers to the resources across our 12 projects...our staff can
work on up to 7 projects at once - when the resources were added to the
project the option to replace with the same resource name in the global
resource pool came up and was accepted -- so we believed that we only had 1
reference for each resource. Now however we've found 2 'types' of some of the
resources (ie. some of the people) in the projects - one local and one
global. In the plans we can't tell which is which to replace one with the
other.
other issue refers to the resources across our 12 projects...our staff can
work on up to 7 projects at once - when the resources were added to the
project the option to replace with the same resource name in the global
resource pool came up and was accepted -- so we believed that we only had 1
reference for each resource. Now however we've found 2 'types' of some of the
resources (ie. some of the people) in the projects - one local and one
global. In the plans we can't tell which is which to replace one with the
other.