SHIFT ALL DATES

N

Neill

I am using the trial version of 2007. The Analysis toolbar was not available
which has the Shift All Dates macro nor was the SAD macro available. Do I
have to have the non-trial version to make it available? It says in the Help
screen that the macro is available in the Analysis toolbar.
 
J

JulieS

Hi Neill,

I believe the version of Project that is available through the trial
version is the same version that was released to the general public
(12.0.4518.1014), so I don't believe it is a trial issue. Try the fix
noted under FAQ #46 "Analysis Toolbar (Project 2000+) at:

http://project.mvps.org/faqs.htm

I hope this helps. Let us know how you get along.

Julie
Project MVP

Visit http://project.mvps.org/ for the FAQs and additional information
about Microsoft Project
 
N

Neill

Hi Julie,

After a round-about fashion of using the Organizer to copy toolbars to the
2007 global.mpt from a 2003 project I had copied the Analysis Toolbar from
the 2003 global.mpt into I got the Analysis Toolbar to show with the SAD
button. Don't try to figure it out. It worked! Thanks for your help!

Neill
 
J

JulieS

Hi Neill,

Congratulations on your ingenuity :)

You're welcome for the assistance and thanks for the feedback.

I hope this helps. Let us know how you get along.

Julie