I want to show just the summary tasks of a project with the typical black bar
inside to show the % Completed. I have a label to the right showing the
number and I have changed the default configuration of the summary bar to
resemble the default task bar, but the % Completed bar is not showing up as
it does in the normal tasks. Can this be done? How?