I
iyla_is
Hello
The problem that I am facingis that even after I have updated the actual
work I still dont get the actual cost showing. I have entered the hourly rate
for the resource assigned to the task. The strange thing is, this is not the
same for all the tasks.
For example: I have three recurring tasks: the first one is the forman
supervision: this one is showing correctly. the second one is the site
engineer supervision, this one is not showing correctly. the third one is the
senior project manager supervision, and it is not showing correctly.
What could the problem be?
thank you
The problem that I am facingis that even after I have updated the actual
work I still dont get the actual cost showing. I have entered the hourly rate
for the resource assigned to the task. The strange thing is, this is not the
same for all the tasks.
For example: I have three recurring tasks: the first one is the forman
supervision: this one is showing correctly. the second one is the site
engineer supervision, this one is not showing correctly. the third one is the
senior project manager supervision, and it is not showing correctly.
What could the problem be?
thank you