C
Clement
I want to know if is possible to build a structure, like RBS, that
alows the folowing:
when i assign to a task an upper level of resources, automatically
assign all resources from lower levels.
for example:
1 Ms Office
1.1 Ms Word
1.2 Ms Excel
1.3 Ms Access etc.
and to assign to the task "Office installation" just the resource 1 Ms
Office and that to automatically assign 1.1, 1.2, 1.3 etc.
is it possible?
alows the folowing:
when i assign to a task an upper level of resources, automatically
assign all resources from lower levels.
for example:
1 Ms Office
1.1 Ms Word
1.2 Ms Excel
1.3 Ms Access etc.
and to assign to the task "Office installation" just the resource 1 Ms
Office and that to automatically assign 1.1, 1.2, 1.3 etc.
is it possible?