If I have a resource who is working on two different
projects at the same time and those projects will be
consolidated into a Masterand use a resource pool. What
is the best way to assign the percentage? Do I assign
50% in each project or do I assign 100% and let my
resource pool and consolidation show me the
overallocations and fix them then? We have project
deadlines that cannot be extended.