I am trying to set up my calendar and working times to
reflect a (2) shift operation. These shifts are working
6am to 6pm and 6pm to 6am, 7days a week. I have tried
several configurations and project is not liking it.
How do I ge this done so that Project will accept what I
am doing.
Peter