I've relabeled "Cost1" to "Estimated Cost" and have set that equal to
the Project field "Cost" via a formula. Currently, I have both
"Estimated Cost" and "Cost" side by side on my Gannt chart. The
column labeled "Cost" shows the costs summed at the summary task
level. The column labeled "Estimated Cost" does not. Since I set
"Estimated Cost" equal to "Cost", why am I not seeing summed costs at
the summary task level?
Thanks.
the Project field "Cost" via a formula. Currently, I have both
"Estimated Cost" and "Cost" side by side on my Gannt chart. The
column labeled "Cost" shows the costs summed at the summary task
level. The column labeled "Estimated Cost" does not. Since I set
"Estimated Cost" equal to "Cost", why am I not seeing summed costs at
the summary task level?