M
mdoster
Ok... it's me again - brand new user...
I need to list resources (sometimes multiple) for each task, but ONLY show
it shows up on a report for each person. We do not assign or track
real/actaul hours. So here's what I've done to try to simplify...
Task #1: Tasks/Advanced Tab: "Must Start On" with a start date (this is
the only constraint I've set in the project); Fixed Duration; Effort Driven
unchecked
All other tasks have the same settings except no constraint date and default
to "As Soon as Possible."
Each Resource: Booking type - Proposed; Type - Work; Change Working Time -
I've added in their vacation days; $0 per hour
So my project is set up so that I set the start date and manually keep
adjusting it until I hit the finish date I need. It was working fine until
I added the resources and now it will change the duration on a couple of task
when I set the start date on Task #1.
I'm so frustrated... isn't there a way to 1) truly lock down the duration
and 2) list resources without it trying to list any scheduled/actual
time/hours? This should be so simple. Sigh...
Melinda
As
I need to list resources (sometimes multiple) for each task, but ONLY show
it shows up on a report for each person. We do not assign or track
real/actaul hours. So here's what I've done to try to simplify...
Task #1: Tasks/Advanced Tab: "Must Start On" with a start date (this is
the only constraint I've set in the project); Fixed Duration; Effort Driven
unchecked
All other tasks have the same settings except no constraint date and default
to "As Soon as Possible."
Each Resource: Booking type - Proposed; Type - Work; Change Working Time -
I've added in their vacation days; $0 per hour
So my project is set up so that I set the start date and manually keep
adjusting it until I hit the finish date I need. It was working fine until
I added the resources and now it will change the duration on a couple of task
when I set the start date on Task #1.
I'm so frustrated... isn't there a way to 1) truly lock down the duration
and 2) list resources without it trying to list any scheduled/actual
time/hours? This should be so simple. Sigh...
Melinda
As