C
CK
Am trying to redo a time sheet for my manager. Have the page set up;
however, cannot get the label to go vertically in the A column of the sheet.
Can anyone direct me on how to do this--I need to have this for Monday.
TIA
however, cannot get the label to go vertically in the A column of the sheet.
Can anyone direct me on how to do this--I need to have this for Monday.
TIA