J
JC
Is there a way to automatically update the % complete based on the timeline?
ie. IF a tash has a 20 day duration and today is the 15th day, can the %
field be set at 75%
ie. IF a tash has a 20 day duration and today is the 15th day, can the %
field be set at 75%