I am attempting to print a Resource Usage report from Project 2000. The
project has a very long timeline and I want to only print a specific
date range. I enter the date range on the Print dialog box, however the
print preview and print out both contain the entire date range. Should
I be defining the date range on another dialog box? Is this a bug in
2000? if so, does 2003 address this problem?
Thanks in advance,
Alex