Hello
A resource charges 200/hr in one project, but later charges 300/hr in
another. If I change the rate, the new one gets reflected in both the
projects which is wrong, he has signed the contract at the old rates for old
project. How do I use him from the resource pool?
Milind
A resource charges 200/hr in one project, but later charges 300/hr in
another. If I change the rate, the new one gets reflected in both the
projects which is wrong, he has signed the contract at the old rates for old
project. How do I use him from the resource pool?