B
Barbara G
Hi
I have a pm who saved their project to a local file with actual hours
attached. When they try to save it back to the server, a majority of the
actual hours disappear. However, their local copy still has the actual hours.
Is there a way to save that project to the server without losing actual
hours?
Thanks,
I have a pm who saved their project to a local file with actual hours
attached. When they try to save it back to the server, a majority of the
actual hours disappear. However, their local copy still has the actual hours.
Is there a way to save that project to the server without losing actual
hours?
Thanks,