E
Erica
I was told that I could have the same task in two places. I can not figure
out how to do this. I have a project organized by objectives and I need to
put the same taks under two categories. I want them to be the same tasks that
update at the same time. Is this possible?
out how to do this. I have a project organized by objectives and I need to
put the same taks under two categories. I want them to be the same tasks that
update at the same time. Is this possible?