I have to set up a custom field that represents a distance.
So in the tasks I’d like to track the distances daily...
How can I do this?
If I look at the “Task Usage”, I see the work, the actual work.... I’d
like to see also the meters and the actual meters (for every day, in a
calendar view...)
Is it possible????
Let me do an example:
- Task: Cover 100 meters
- Distance: 100
- Duration: 10 days
- Meter per Day: 10
For these information I will use 3 custom fields (number)
How and where can I track the meters covered per day?
I‘d like to view on a screen similar to the “task usage”, the
information on the meter that I have to cover every day and the real
covering daily... on a calendar, like a timesheet, but not with the
time, with the physical distance....
Can someone suggest me something?
Thanks so much to everybody
Vit
I have to set up a custom field that represents a distance.
So in the tasks I’d like to track the distances daily...
How can I do this?
If I look at the “Task Usage”, I see the work, the actual work.... I’d
like to see also the meters and the actual meters (for every day, in a
calendar view...)
Is it possible????
Let me do an example:
- Task: Cover 100 meters
- Distance: 100
- Duration: 10 days
- Meter per Day: 10
For these information I will use 3 custom fields (number)
How and where can I track the meters covered per day?
I‘d like to view on a screen similar to the “task usage”, the
information on the meter that I have to cover every day and the real
covering daily... on a calendar, like a timesheet, but not with the
time, with the physical distance....
Can someone suggest me something?
Thanks so much to everybody