J
jmehring
I am running project 2003 and would like to use a project template from
microsoft.
I downloaded the template. When I try to change the dates or duration they
are always grayed out.
How do I unlock these fields so I can put in my own dates?
microsoft.
I downloaded the template. When I try to change the dates or duration they
are always grayed out.
How do I unlock these fields so I can put in my own dates?