G
Glenda
In a flowchart, I am trying to connect a decision shape to a process shape.
I am unable to create a dynamic connection. Is there a limit to the number
of dynamic connections in a doc? What am I doing wrong? I've read and
re-read the tutorial, tried the connection button on the toolbar, tried the
dynamic connector on the shapes window, re-booted the computer and still I
can't get those little connector boxes to turn red. HELP
I am unable to create a dynamic connection. Is there a limit to the number
of dynamic connections in a doc? What am I doing wrong? I've read and
re-read the tutorial, tried the connection button on the toolbar, tried the
dynamic connector on the shapes window, re-booted the computer and still I
can't get those little connector boxes to turn red. HELP