Hi
I have created a drop-down menu using a custom text field and wish to
enter a date into Baseline Finish based on the users selection. For
example; if the user selects J350 from the drop-down, it enters 1/20/07
in the Baseline Finish. There are roughly 20 possibilities the user
could select so it would be nice if I could centrally store a simple
matrix or look-up table that Project could pull from.
As a side note, the drop-down selections represent the assembly cost
center and the Baseline Finish is the assembly load date. The reason
the load date is the Baseline Finish is because I’m scheduling from the
Project end date backward to schedule all events necessary to design and
fabricate parts for assembly. The load dates change periodically and I
need a way to ensure consistency and accuracy across schedules.
VB, Macro, Formula….????????
I have created a drop-down menu using a custom text field and wish to
enter a date into Baseline Finish based on the users selection. For
example; if the user selects J350 from the drop-down, it enters 1/20/07
in the Baseline Finish. There are roughly 20 possibilities the user
could select so it would be nice if I could centrally store a simple
matrix or look-up table that Project could pull from.
As a side note, the drop-down selections represent the assembly cost
center and the Baseline Finish is the assembly load date. The reason
the load date is the Baseline Finish is because I’m scheduling from the
Project end date backward to schedule all events necessary to design and
fabricate parts for assembly. The load dates change periodically and I
need a way to ensure consistency and accuracy across schedules.
VB, Macro, Formula….????????