Bryan A
Hi all,
I am trying to manage 20+ projects. Of which I have created a separate
MSP2002 file for. Each of them are linked to a master project plan that
contains the resources, which are shared. I then saved a baseline for each
of the projects. I then inserted each project into the master project plan
and everything looked correct. I came back to this 4 days later and opened
the master file and no baselines. So I opened each file separately and no
baseline.
what happened to my baselines???
Thanks for your help!
Bryan
I am trying to manage 20+ projects. Of which I have created a separate
MSP2002 file for. Each of them are linked to a master project plan that
contains the resources, which are shared. I then saved a baseline for each
of the projects. I then inserted each project into the master project plan
and everything looked correct. I came back to this 4 days later and opened
the master file and no baselines. So I opened each file separately and no
baseline.
what happened to my baselines???
Thanks for your help!
Bryan