I have some wishlist for upcoming project server, and hopefully it will be
heard by microsoft team
:
- protect baseline where the baseline should save by the other user (not by
PM) for controlling and prevent the PM to overwrite the baseline.
- customizing the email notification body message. It means we can add some
additional fields such as baseline, actual work, etc or to customize the
body message.
-sorting the report name in the portfolio analyzer view page in the drop
down list at the right top of this page: PWA|Projects|analyze projects
inPortfolio Analyzer (/projectserver/views/visionview.asp)
- rename the project name
- archiving some old projects where the archived version will not processedd
by the OLAP Cube.
- locking the actual work in the tasks page for certain period: i saw this
enhancement in the project server 2003 and i thought we can improve it again
where locking period could for certain resources too.
Thks.
heard by microsoft team
- protect baseline where the baseline should save by the other user (not by
PM) for controlling and prevent the PM to overwrite the baseline.
- customizing the email notification body message. It means we can add some
additional fields such as baseline, actual work, etc or to customize the
body message.
-sorting the report name in the portfolio analyzer view page in the drop
down list at the right top of this page: PWA|Projects|analyze projects
inPortfolio Analyzer (/projectserver/views/visionview.asp)
- rename the project name
- archiving some old projects where the archived version will not processedd
by the OLAP Cube.
- locking the actual work in the tasks page for certain period: i saw this
enhancement in the project server 2003 and i thought we can improve it again
where locking period could for certain resources too.
Thks.