B
baba1970
I created three project plans sharing a resource pool. The resource pool
project plan got corrupted (I am assuming since I couldn't open it) so I
created a nbew one and refreshed from the project plan. This overwrote the
resources as the new ID's did not match the ones in the plans. I've since
detached the plans from the resource pool and cleaned them up. Can I create
a resource pool from these three plans to share resources without
encountering the same problem? BTW, the 3 plans do not currently have an
duplicate resources.
project plan got corrupted (I am assuming since I couldn't open it) so I
created a nbew one and refreshed from the project plan. This overwrote the
resources as the new ID's did not match the ones in the plans. I've since
detached the plans from the resource pool and cleaned them up. Can I create
a resource pool from these three plans to share resources without
encountering the same problem? BTW, the 3 plans do not currently have an
duplicate resources.