I have 20 identical test stands and 35 tests of different test lengths that
can be run on any of the test stands. Is there any way I can setup project
so that it will look at the identical test stands as a pool and assign the
tests to the test stands automatically to minimize the overall project
timing. I have not found a way to make this work in Project2000 and would
consider project2003 if this capability is available.
Thanks